What is required when installing plastic piping underground to prevent heat impairment?

  1. Insulation from other gas pipes

  2. Sufficient clearance or insulation from any source of heat

  3. A specific type of protective casing

  4. Replacement of metal components with plastic

The correct answer is: Sufficient clearance or insulation from any source of heat

When installing plastic piping underground, it is essential to ensure sufficient clearance or insulation from any source of heat to prevent thermal impairment. Plastic piping can be sensitive to high temperatures, which can lead to deformation or degradation of the material over time. By maintaining proper clearance from heat sources or providing adequate insulation, the integrity and functionality of the piping system are preserved. This practice is crucial for ensuring safety and compliance with installation standards, as it helps to avoid situations where the heat might compromise the strength and durability of the plastic piping. The need for such precautions is particularly important in environments where industrial processes, heated surfaces, or other thermal sources may be present. The other options, while relevant to various aspects of piping installation, do not address the primary concern of thermal protection for plastic pipes as effectively as ensuring sufficient clearance or insulation from heat sources does.